San Luis Obispo Breaks Ground on Stantec-Designed Facility
The 27,500-square-foot operations and maintenance facility will include parking for up to 67 public transit vehicles, as well as 84 visitor and employee vehicles, and will include five repair bays, parts storage, and locker rooms.

In support of the agency’s wide coverage area, the facility was programmed to operate, service, and maintain RTA’s entire fleet and serve as the headquarters for the agency.
Rendering via Stantec
Calif.’s San Luis Obispo Regional Transit Authority (RTA) recently broke ground on a new bus operations and maintenance facility. Top 10 global design firm, Stantec, planned and designed the bus facility, which will play a vital role in the RTA’s ability to deliver safe, reliable transit services for San Luis Obispo County.
In support of the agency’s wide coverage area, the facility was programmed to operate, service, and maintain RTA’s entire fleet and serve as the headquarters for the agency. The facility will house the approximately 65 transit vehicles that will dispatch out of this location. The remainder of the future 112 vehicle fleet will dispatch from RTA’s several small park-out facilities across the county.
The 27,500-square-foot operations and maintenance facility will include parking for up to 67 public transit vehicles, as well as 84 visitor and employee vehicles, and will include five repair bays, parts storage, and locker rooms. The facility — designed with efficiency in mind — reflects the agency’s close-knit, family atmosphere, and will feature a large shared breakroom that opens out to an employee patio.
The RTA facility is designed to meet the requirements of California’s Green Building Code (CalGreen). The sustainable building design completely eliminates the operational use of fossil fuels on-site, maximizes the potential for photovoltaic power generation on the building roof and over vehicle parking, utilizes ultra-local building materials, and has been designed to accommodate a future all-electric vehicle fleet to be implemented by 2040.
“It’s exciting to see the San Luis Obispo RTA bus operations and maintenance facility reach this critical milestone,” said Will Todd, Stantec project manager. “This is a project that will truly belong to the people who use it. We worked closely with San Luis Obispo RTA to design a sustainable, high-performance facility designed to meet the comfort of the agency’s workforce, with ample room for future growth.”
Stantec provided architecture, civil engineering, survey, landscape architecture, mechanical and plumbing engineering, industrial architecture, telecom design, and fire protection engineering on the project. The San Luis Obispo RTA bus operations and maintenance facility is scheduled to be complete in late 2021.
More Bus

Brian Dickson on Building Stronger, More Resilient Transportation Organizations
Bus Business Consultants Founder Brian Dickson discusses the leadership principles, operational discipline, and strategic planning that separate transportation companies positioned for long-term success from those stuck in survival mode.
Read More →
LA Metro Breaks Ground on Vermont BRT Project
The 12.4-mile corridor is projected to serve 66,200 daily riders, reduce travel times by up to 24%, and create the nation's busiest bus rapid transit corridor.
Read More →
Roman Cornell on ABC Companies’ Evolution and the Future of Passenger Transportation
The company’s CEO discusses carrying forward a third-generation family legacy, ABC’s continued evolution in passenger transportation, support for increasingly complex fleets, and how technology and continued investment could help operators improve uptime.
Read More →
VIA Bus Ridership Grows 10.1% Through August 2026
San Antonio's VIA Metropolitan Transit reported the highest bus ridership growth among major Texas transit systems. Federal Transit Administration data ranked it second among the nation's 50 largest transit systems.
Read More →
LA Metro September Ridership Climbs 3.9%, Led by Rail Growth
The agency recorded more than 27.2 million boardings, with rail ridership increasing 12.4% year over year and the D Line posting the largest gains.
Read More →
Frontrunner Bus Group Introduces XF Low-Floor Bus with Enhanced Accessibility
The new mid-sized bus features a full flat-floor design, eight-inch curbside step-in height, and zero-entry rear ramp to improve passenger access and operational flexibility.
Read More →
Scenes from APTA TRANSform & EXPO 2026
Transit leaders, manufacturers, and industry professionals gathered in Chicago to explore new technologies, share ideas, and discuss the future of public transportation.
Read More →
More Than a Summer Job: Building the Next Generation of Transit Talent
The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.
Read More →
LA Metro Board Awards 220 Battery-Electric Bus Contract to ENC
The contract, which is the largest base award of battery-electric buses by a U.S. transit agency, will be built in Southern California, sustaining good jobs as LA prepares to welcome the world in 2028
Read More →
Public Transit Conference Returning to GFX in 2027, Call for Papers Now Open
The Call for Papers is now open, allowing transit agency professionals and industry experts to help shape the PTC educational program by submitting session ideas for consideration.
Read More →