SANDAG Taps HDR to Provide Environmental, Conceptual Engineering for LOSSAN Realignment
The firm has worked with SANDAG since 2020 on the San Diego Regional Rail Alternatives Analysis and Conceptual Engineering Study that set the groundwork for the realignment.

HDR, partnering with Mott MacDonald and several other firms including small businesses, will work with SANDAG to complete the CEQA and NEPA processes in 2026 to support the goal of opening the relocated rail line by 2035.
HDR
The San Diego Association of Governments selected HDR to lead the next phase of work on its critical San Diego LOSSAN Rail Realignment Project.
HDR will lead the environmental clearance and advanced conceptual engineering. The firm has worked with SANDAG since 2020 on the San Diego Regional Rail Alternatives Analysis and Conceptual Engineering Study that set the groundwork for the realignment.
SANDAG’s Project
HDR, partnering with Mott MacDonald and several other firms including small businesses, will work with SANDAG to complete the CEQA and NEPA processes in 2026 to support the goal of opening the relocated rail line by 2035.
“This project has been the highlight of my career, with a goal of creating solutions that benefit everyone involved,” said HDR Principal-in-Charge Rob Klovsky. “Not only is it a vital project that will keep our community connected to a national resource, but it’s also a crucial step towards addressing climate change. With the trust and leadership of SANDAG, I am confident that we can bring this project to fruition and keep our community connected.”
Within the city of Del Mar, the existing single track sits atop coastal bluffs that are rapidly eroding and threatened by sea level rise. The project will relocate about five miles of the rail line inland, from the bluffs to a double-tracked alignment located primarily in tunnel and through Los Peñasquitos Lagoon in the City of San Diego.
Benefits of the LOSSAN Corridor Project
SANDAG anticipates the project will enhance safety, reliability, and increase capacity along the Los Angeles-San Diego-San Luis Obispo, or LOSSAN, Rail Corridor.
The project will also be the first on the LOSSAN Corridor designed to accommodate train speeds up to 110 mph, paving the way for future speed improvement projects on the corridor.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →