METRO Magazine Logo
MenuMENU
SearchSEARCH

Texas DOT releases funds for Denton rail project

The A-train project, which is part of the Regional Transportation Council’s Mobility 2025 and Mobility 2030 plans, has been the central element of DCTA’s Service Plan and endorsed by local, regional and state leaders, as well as Denton County voters.

March 5, 2009
1 min to read


The Texas Department of Transportation (TXDOT) executed a contract with the Denton County Transportation Authority (DCTA), releasing $250 million to DCTA for a 21-mile passenger rail line from Denton to Carrollton, dubbed the A-train. DCTA will provide the 20 percent match to complete the funding.

The A-train project, which is part of the Regional Transportation Council’s Mobility 2025 and Mobility 2030 plans, has been the central element of DCTA’s Service Plan and endorsed by local, regional and state leaders, as well as Denton County voters. The Regional Transportation Council approved funding for this project last year.

Ad Loading...

"DCTA's A-train project is a great example of how the region can leverage funds to create a multi-modal transportation system, providing our residents choices for how they want to travel," said Linda Koop, chair of the RTC.

The A-train project includes single-phase construction of 21-miles of regional rail, five rail stations, a bicycle/pedestrian trail, and a regional rail operating and maintenance facility. The immediate objective of the project is to have full service between Denton and Carrollton to interface with Dallas Area Rapid Transit’s (DART) light rail system by December 2010. The 2010 opening would coincide with DART’s opening of the northern section of its Green Line and complete a 50-mile segment of regional passenger rail that is detailed in the Mobility 2030 plan.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →