Amtrak, VRE Trains Now Serving New Boarding Platform at Washington Union Station
Amtrak has opened a new track and platform at Washington Union Station to reduce congestion and expand capacity. The upgrade supports Virginia Railway Express and Amtrak services connecting the Northeast Corridor with destinations across the Southeast.
The new platform includes accessible features such as a dedicated hallway, elevator, escalator, and stairs to improve station navigation for all passengers.
Photo: Amtrak
2 min to read
Amtrak has opened a new platform and track at Washington Union Station to expand service capacity and improve train movement through the Northeast Corridor and into Virginia.
The new Track 22 platform will primarily support Virginia Railway Express (VRE) trains, in addition to Amtrak Long Distance and Amtrak Virginia services. The project aims to reduce congestion at Amtrak’s second-busiest station.
Ad Loading...
“This investment helps ease congestion and improve reliability at a critical point in the rail network,” said Amtrak President Roger Harris.
VRE CEO Rich Dalton added that the expansion enhances “reliability and flexibility of service for all passengers moving through the station.”
Track 22 at Washington Union Station now accommodates Virginia Railway Express and Amtrak trains, expanding capacity at the Northeast Corridor hub.
Photo: Amtrak
Platform and Station Improvements
Track 22 is located on the lower level of the 118-year-old station and was previously used for train storage. Work included installing new track, rebuilding the platform, and restoring historic structural columns.
The platform is now fully accessible, featuring a new hallway with elevator, escalator, and stair access from the station concourse.
Broader Station Upgrades
Amtrak, which assumed daily operational control of the station over a year ago, has also advanced several initiatives to improve station usability. These include:
Ad Loading...
A new ticketed waiting area with additional seating
A revised boarding process to reduce congestion
State-of-good-repair improvements focused on safety and maintenance
New retail offerings in the station
The upgrades are part of Amtrak’s broader efforts to modernize Washington Union Station as a multimodal transportation hub.
The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.
Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.
The milestone is a significant step toward modernizing the MAX Blue Line’s power infrastructure, one of the oldest components of the region’s light rail system.
The firm will lead the Tier 2 environmental review program for the Coachella Valley Rail Corridor, including the conceptual and preliminary engineering needed to develop project-level environmental clearance.
The ATP board’s approval of ARC enables ATP to begin pre-construction activities and advance final design for Austin Light Rail under the first phase of what will be a multibillion-dollar contract.
Additionally, construction activity is estimated to generate more than $154 million in tax revenue, including more than $20 million for Los Angeles County.
The project represents a significant milestone in the agency’s ongoing efforts to enhance connectivity, activate publicly owned land, and create walkable communities centered around transit.
The nearly $1 billion FrontRunner 2X project is a transformative investment to modernize and expand the 89-mile commuter rail corridor between Ogden and Provo.