METRO Magazine Logo
MenuMENU
SearchSEARCH

CapMetro Announces Start of North Burnet/Uptown Station Project

Starting this month, construction crews will be on site to perform preliminary work, in preparation for the complete construction to begin in November 2025.

October 8, 2025
CapMetro Announces Start of North Burnet/Uptown Station Project

The North Burnet/Uptown Station — part of the Red Line corridor connecting Downtown Austin to Leander — contributes to Project Connect’s broader vision to expand and enhance the Red Line, improving commuter rail access and reliability across the region. 

Photo: CapMetro

2 min to read


The North Burnet / Uptown Station reflects a potent combination of Brandywine Realty Trust’s private development expertise and CapMetro’s public transit leadership. 

Photo: CapMetro

Austin, Texas’s CapMetro and Brandywine Realty Trust have begun site preparations for the new North Burnet/Uptown Station, formerly referred to as Broadmoor Station. 

Starting this month, construction crews will be on site to perform preliminary work, in preparation for the complete construction to begin in November 2025.

Ad Loading...

Bringing Public Transit to Central Texas

The collaborative effort represents another significant investment in public transportation in Central Texas, bringing enhanced connectivity to the heart of one of North Austin’s fastest-growing communities. The station is projected to become the second busiest along CapMetro’s Red Line, strengthening the area’s role as a dynamic, transit-oriented, mixed-use district.

The North Burnet/Uptown Station — part of the Red Line corridor connecting Downtown Austin to Leander — contributes to Project Connect’s broader vision to expand and enhance the Red Line, improving commuter rail access and reliability across the region. 

The new station will provide direct commuter rail access to one of the city's most transformative mixed-use developments. Located just steps from Solaris House, a modern residential community, and One Uptown, a Class-A office tower, the station will serve as a vibrant gateway for thousands of commuters, residents, and visitors.

“This marks a strong step forward in building a smarter, more connected future for Central Texas,” said Dottie Watkins, president and CEO of CapMetro. “The North Burnet/Uptown Station isn’t just about expanding transit — it’s about creating meaningful access to opportunity in one of our region’s fastest-growing corridors.”

About the North Burnet/Uptown Station

The newest Red Line Station is located within the 66-acre Uptown ATX development in the growing North Burnet corridor, just north of the existing Kramer Station.

Ad Loading...

Key features include:

  • Two double-length platforms to accommodate high-capacity service.

  • Over a half mile of double track to support operational reliability.

  • Pedestrian- and bike-friendly pathways to support multimodal access.

  • Connections to local bus routes for integrated transit options.

  • 200 shared parking spaces for customers.

  • Various safety and security enhancements, including lighting and surveillance.

A Strategic Public-Private Partnership

The North Burnet / Uptown Station reflects a potent combination of Brandywine Realty Trust’s private development expertise and CapMetro’s public transit leadership

Brandywine is contributing the land, coordinating the infrastructure, planning, and providing investment, while CapMetro is delivering the regional mobility framework and the operational infrastructure to ensure long-term transit accessibility.

Brandywine and CapMetro will coordinate all construction updates, service impacts, and launch details. In the meantime, the development of new commercial, residential, and civic spaces at Uptown continues.

More Rail

An Amtrak Acela train at New York Penn Station
Railby StaffMarch 24, 2026

Transportation Secretary Duffy, Amtrak Announce Progress on New York Penn Station Project

As part of the contract, the AECOM-LiRo NYPennT Joint Venture will work with Amtrak and the selected Master Developer to completely transform Penn Station, improving safety and operational efficiency, making the system more family-friendly, accommodating increased train and passenger capacity, and delivering a world-class experience to its growing passenger base, according to Amtrak officials.

Read More →
A screenshot of ZeroEyes AI gun detection technology.
Railby Staff and News ReportsMarch 24, 2026

ZeroEyes Launches ZeroLink to Expand AI Gun Detection Beyond Traditional Networks

New edge-based solution enables real-time threat detection and situational awareness in remote, mobile, and infrastructure-limited environments.

Read More →
A Chicago rail and rail car in the city.
Railby Staff and News ReportsMarch 23, 2026

Chicago Transit Authority Sues USDOT Over Paused Funding for Red Line Extension, Modernization Projects

The Chicago agency seeks restoration of nearly $2 billion in federal funding, warning halted projects could impact transit access and economic growth.

Read More →
Ad Loading...
GO Transit railcars
Railby StaffMarch 20, 2026

Alstom Awarded 5-Year Extension for GO Transit, UP Express Services

Company officials said that this latest contract extension with Metrolinx consolidates the company’s position as the leading private provider of Operations and maintenance services in North America.

Read More →
A New York MTA subway car with an open gangway
Railby StaffMarch 20, 2026

New York MTA Seeks Bids for 2,390 Subway Cars in Record-Breaking Order

The new cars, model R262, will be funded by the MTA’s 2025-29 Capital Plan, which received a historic $68 billion in funding from Governor Hochul and the State Legislature in the FY26 Enacted State Budget.

Read More →
Graphic from Amtrak promoting the B&P Tunnel Replacement and Frederick Douglass Tunnel project, featuring the Amtrak logo, project title and an illustration of a high-speed train near the West Baltimore MARC Station.
Railby News/Media ReleaseMarch 17, 2026

Amtrak Announces Community Grants for Projects Near Baltimore’s New Frederick Douglass Tunnel

Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.

Read More →
Ad Loading...
Amtrak train with logo
Railby StaffMarch 16, 2026

Amtrak Marks Restoration of Two South Carolina Stations

The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.

Read More →
A view looking down the rail across the new Portal North Bridge.
Railby Staff and News ReportsMarch 13, 2026

NJ Transit, Amtrak Prepare to Open First Track on New Portal North Bridge

The new bridge will begin carrying passenger trains on March 16, replacing a 116-year-old swing bridge that has long caused delays.

Read More →
Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
Ad Loading...
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →