
Boston's MBTA Completes Latest Green Line Work
The work took place during 12 consecutive days of shuttle bus service replacement between Kenmore and Cleveland Circle.
Read More →
The work took place during 12 consecutive days of shuttle bus service replacement between Kenmore and Cleveland Circle.
Read More →
Made possible by grant funding from the CRISI program, this pioneering technology creates a better experience for drivers and pedestrians while increasing safety for Metrolink passengers.
Read More →
The contractor named a new CEO and promoted its previous CEO.
Read More →
The addition will offer passengers a seamless one-seat ride to and from Downtown Miami, significantly reducing travel time between the West Palm Beach and MiamiCentral stations.
Read More →
The 1,000-mile testing process is the final step of testing required to ensure all safety and quality standards are met before the train can operate on SacRT’s tracks when service of the new low-floor trains begins later this summer.
Read More →
He will succeed Richard Davey, who served as president of New York City Transit from May 2022 until announcing his departure this week.
Read More →
The Mark V design features consist of five-car sets, all internally open-ended with walk-through carriages. They have mostly forward-facing seating and include more space for bikes, luggage, and leaning pads.
Read More →
The investment, created by the Bipartisan Infrastructure Law, has been awarded through the All Stations Accessibility Program.
Read More →
In April 2024, Metro had 26,210,300 boardings on its bus and rail services. A total of 21,286,056 rides were taken each weekday, with Saturday boardings at 2,702,268 and Sunday boardings at 2,221,976.
Read More →
The operating budget totals $539.3 million, an increase of less than 1% over last year’s budget, reflecting changes in inflation, rising costs in goods, and a labor shortage that is affecting transit agencies across the country.
Read More →
The action finalizes the environmental review for this two-phased project that will extend the Metro E Line nine miles further east from its current terminus at Atlantic Station in East Los Angeles to Lambert Station in the City of Whittier.
Read More →