METRO Magazine Logo
MenuMENU
SearchSEARCH

$26M Arlington streetcar design contract awarded to HDR

The contractor will develop preliminary design plans for the Columbia Pike and Crystal City-Potomac Yard streetcar segments and technical specifications for the streetcar vehicles.

September 24, 2014
$26M Arlington streetcar design contract awarded to HDR

 

2 min to read


Arlington County approved the award of a $26 million, multiphase contract to HDR Engineering Inc. to begin engineering and design on the 7.4-mile Arlington-Fairfax streetcar system. The contractor will develop preliminary design plans for the Columbia Pike and Crystal City-Potomac Yard streetcar segments and technical specifications for the streetcar vehicles.

“The start of preliminary engineering is a major milestone, and keeps us on track to start streetcar service in 2020,” said Arlington County Board Chair Jay Fisette. “As we move this project from concept to reality, we’ve assembled a team with proven expertise developing streetcar projects across the country and the skills to help us deliver this program cost-effectively.”

Expected to take 18 months, preliminary engineering will include developing 30% design plans for the roadway, track alignment, power, signals, stations and facilities; vehicle specifications; and updated construction cost estimates. Optional tasks cover items such as conditions discovered during engineering and additional surveys or traffic analysis. Subsequent phases of the contract, if awarded, may include final design or assistance transitioning the engineering work to an alternative project delivery contractor, such as a design-builder.

The Board voted 3 to 2 to award the streetcar engineering contract.

The contract amount, including base scope, options and contingency, is 5.4% of the streetcar program’s construction cost estimate – in line with the 3-7% industry standard and the 2012 Federal Transit Administration recommendation of 6% for the Columbia Pike segment. Arlington’s contract costs are funded by a combination of state grants, commercial real estate tax revenues that can only be spent on new transportation projects, and a fund dedicated to infrastructure investment in Crystal City.

Arlington’s planned streetcar system includes two segments – Columbia Pike and Crystal City-Potomac Yard – that meet in Pentagon City. High-capacity streetcars will operate along with buses to serve the growth in population and jobs expected along these corridors. The streetcar also will help create a more walkable “Main Street” on Columbia Pike and encourage more people to use transit – while attracting new jobs and generating new tax revenues for Arlington and Fairfax Counties.

More Management

Cover photo for A Practical Guide for Selling to Private Equity
MotorcoachApril 3, 2026

How Motorcoach Operators Can Prepare for a Private Equity Sale

Essential strategies to strengthen your business before entering a private equity transaction.

Read More →
A fleet of Caltrain electrified trains on tracks
Railby StaffApril 3, 2026

Funding Gap Could Force Caltrain to Slash Service, Close Stations

The Peninsula Corridor Joint Powers Board recently met for a budget workshop, during which staff outlined the significant service reductions Caltrain could be forced to make without new external funding. 

Read More →
METRO's People Movement with MCI President Rob Marion
Managementby Staff and News ReportsApril 3, 2026

NFI Group Taps New MCI President and More in People Movement

In this edition, we cover recent appointments and announcements at Alstom, VIA Metropolitan Transit, Transdev US, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
A subway train stopped at the 48th Street platform in Manhattan.
Managementby Staff and News ReportsApril 1, 2026

Manhattan’s Central Business District Travel Climbs to 6.3 Million Daily Trips as Transit Leads Growth

Although volumes remain below pre-pandemic levels, NYMTC’s latest Hub Bound report shows rising transit use, shifting commute patterns, and continued recovery.

Read More →
frontrunner bus
SponsoredApril 1, 2026

Breaking Accessibility Barriers with the Low Floor Frontrunner Minibus

Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.

Read More →
An MBTA commuter rail at a station.
Railby StaffMarch 31, 2026

Massachusetts Announces Summer Savings for Commuter Rail Riders

With major events and increased travel expected across the state this summer, the Administration is focused on making sure people have a reliable, affordable alternative to driving so we can reduce congestion, support daily commuters, and keep Massachusetts moving.

Read More →
Ad Loading...
A MARTA employee using the new Better Breeze fare ticket machines.
Managementby StaffMarch 30, 2026

Updated: MARTA’s New 'Better Breeze' Fare System Goes Live

The new system introduces tap-to-pay, touchscreen kiosks, and updated Breeze cards, with both old and new systems running through May.

Read More →
ABA Marketplace Report
Motorcoachby StaffMarch 30, 2026

ABA Marketplace Drives $124.9M in Business, New Report Finds

As the American Bus Association marks its 100th year, a new ABA Foundation report highlights the Marketplace’s role as a key revenue engine for the bus and group travel industry.

Read More →
Coach USA, Samsara cover shot
Technologyby Alex RomanMarch 30, 2026

How Coach USA Is Using AI to Prevent Bus Accidents

As motorcoaches navigate increasingly congested urban corridors filled with pedestrians, cyclists, scooters, and distracted drivers, safety leaders across the industry are confronting a growing challenge: visibility.

Read More →
Ad Loading...
Five different gold commemorative Smart Trip card designs.
Managementby StaffMarch 27, 2026

WMATA Proposes Revised FY2027 Budget as System Marks 50 Years of Service

Updated financial plan reflects ridership growth and cost controls as the Washington region’s transit system celebrates five decades of operations.

Read More →