METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom to Supply 200 Metra Multilevel Railcars

The move follows Metra’s board approval in January 2021 to award Alstom a vehicle procurement contract for up to 500 railcars.

by METRO Staff
March 18, 2021
Alstom to Supply 200 Metra Multilevel Railcars

The multilevel cars incorporate new design features to improve passenger experience, including a streamlined, modern and welcoming interior equipped with USB plugs.

Credit:

Alstom

2 min to read


Alstom received an initial order from Chicago’s Metra to supply 200 push-pull commuter railcars. The move follows Metra’s board approval in January 2021 to award Alstom a vehicle procurement contract for up to 500 railcars. This initial order of 200 railcars is worth approximately $774 million.

The multilevel cars incorporate new design features to improve passenger experience, including a streamlined, modern and welcoming interior equipped with USB plugs and boasting large windows and a layout to improve passenger flow and traveler comfort; seating and spacing to allow for additional ridership and physical distancing; touchless doors; improved bogie design for improved ride quality; and multiple wide doors on each side of the cars to reduce passenger boarding times and improve access to passenger areas.

Ad Loading...

The new cars will also meet all Americans with Disabilities Act (ADA) and accessibility requirements, including the addition of wheelchair lifts on each side of the vehicles. Fleet reliability will be enhanced through modern, service-proven components and enhanced maintenance and diagnostic system capabilities that will allow Metra to have greater visibility on fleet operational performance and increase fleet availability. Moreover, the new eco-designed cars will be energy efficient, boasting improvements and developments such as full LED lighting and climate control regulation based on passenger load. The new railcars will also be 90% recyclable.

The new cars will be built at Alstom’s rolling stock Centre of Excellence, and North America’s largest rolling stock manufacturing facility in Hornell, N.Y. The Alstom Hornell site will lead the project. Other Alstom sites will support the project including, Rochester, New York, for the automatic train control system.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →