METRO Magazine Logo
MenuMENU
SearchSEARCH

Foster + Partners, Arup to Design First 4 California High-Speed Rail Central Valley Stations

The joint venture will be providing management and design services as part of the first Notice to Proceed to complete the design development and configuration footprint for each station site with an option to progress to the second Notice to Proceed.

Foster + Partners, Arup to Design First 4 California High-Speed Rail Central Valley Stations

The joint venture is set to exceed the authority’s small business participation goals by engaging a team of diverse, local experts, and subcontractors throughout all essential parts of the design development for the new stations.

Credit:

Courtesy of Foster + Partners

1 min to read


Foster + Partners and Arup are collaborating on planning, architecture, and engineering for the four new stations that will serve as models of design for stations planned along the entire 500-mile California High-Speed Rail system.

The team is utilizing its local knowledge, combined with its global high-speed rail station experience, while adapting a systemwide kit of parts previously created by Foster + Partners to design the four Central Valley stations. The joint venture will be providing management and design services as part of the first Notice to Proceed (NTP 1) to complete the design development and configuration footprint for each station site with an option to progress to the second Notice to Proceed (NTP 2), which will include final design, construction ready documents, construction, and commissioning support. The duration for NTP 1 is estimated to be 30 months.

Ad Loading...

The joint venture is set to exceed the authority’s small business participation goals by engaging a team of diverse, local experts, and subcontractors throughout all essential parts of the design development for the new stations.

More Rail

A rendering of Trinity Metro's future station at the Medical Center
Rail•by Alex Roman•October 30, 2026

Trinity Metro Breaks Ground on $270M TEXRail Extension

The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.

Read More →
Austin Light Rail rendering from UT perspective
Rail•by Alex Roman•October 30, 2026

Bringing Austin’s First Light Rail System to Life

Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.

Read More →
Two Metra locomotives on rail tracks.
Rail•by Alex Roman•October 29, 2026

Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail

The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.

Read More →
Ad Loading...
METRO Magazine graphic featuring railroad tracks and switches inside a dark tunnel with the headline “Amtrak Completes First Street Tunnel Upgrades, Restores Service.”
Rail•by Elora Haynes•October 29, 2026

Amtrak Completes First Street Tunnel Upgrades, Restores Service

The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.

Read More →
FRA Invests $2.3B in Rail Projects Nationwide
Rail•by Alex Roman•October 28, 2026

FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide

The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.

Read More →
A Caltrain electric railcar on the tracks
Rail•by Alex Roman•October 27, 2026

Caltrain’s Electrification Drives a New Era of Ridership Growth

The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.

Read More →
Ad Loading...
METRO Magazine graphic featuring a dark blue background with abstract curved lines and the headline “FTA Advances $164M Broward County Commuter Rail Project.”
Rail•by Staff and News Reports•October 26, 2026

FTA Advances $164M Broward County Commuter Rail Project

The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.

Read More →
An A line MTA subway car near the soon to be replaced signaling system.
Rail•by Staff and News Reports•October 23, 2026

New York MTA Launches Historic $1.9B Signal, Track Modernization Project

Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.

Read More →
The LA Metro San Fernando Valley light rail extension corridor
Rail•by Alex Roman•October 20, 2026

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project

The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.

Read More →
Ad Loading...
New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →