Long Island rail breaks ground on 'green' train wash facility
The project, which promises to create between 20 and 30 construction jobs, is being financed with federal stimulus funds through the Federal Transit Administration.
MTA Long Island Rail Road (LIRR) broke ground on a new $25.5 million train wash facility located in the Village of Babylon.
The project, which promises to create between 20 and 30 construction jobs, is being financed with federal stimulus funds through the Federal Transit Administration. The Babylon Train Wash Facility was selected by Gov. David Paterson and the MTA a shovel-ready project that represented the best use of federal stimulus funds.
Important "green" aspects of the facility will include:
The filtering, reconditioning and reusing of more than 70% of wash water.
Supplemental solar power energy panels will help operate the electrical lighting and heating for the train wash equipment building, saving the LIRR an estimated $6,700 a year on utility costs.
Storm water will be collected and released through a leach field, eliminating run-off pollutants into nearby Sumpwams and Geiger Creeks.
A separator will prevent oil and diesel fuel from entering the waste water system.
Area wetlands will be fenced to prevent damage and illicit dumping.
A new landscape buffer will be built between the golf course and the train wash.
The Babylon Branch of the LIRR is the busiest of the LIRR's 11 branches. When it becomes the operational in 2012, the LIRR will be able to clean the exteriors of an additional 180 cars every day. The Railroad currently has one operating train wash at the entrance to its Ronkonkoma Train Yard.
The new Babylon Train Wash Facility will consist of two buildings: A masonry equipment building will house the control, wash room, pumps, reclaim/recycle wash water, waste water treatment system and storage tanks for the train wash. The second structure will be the train wash bay, a steel/corrugated siding structure consisting of pre-cast track slab sections, concrete foundations, wash water collection system and the train wash equipment.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →