METRO Magazine Logo
MenuMENU
SearchSEARCH

Sound Transit, WSDOT Break Ground on Stride BRT Project

The I-405 Stride BRT project includes the S1 Line between Burien and Bellevue scheduled to open in 2028 and the S2 Line between Bellevue and Lynnwood scheduled to open in 2029.

September 13, 2023
Sound Transit, WSDOT Break Ground on Stride BRT Project

Stride BRT will provide fast, reliable high-capacity transit service with connections to light rail in Bellevue, Tukwila, Shoreline, and Lynnwood.

Screenshot Via Sound Transit

2 min to read


Sound Transit, WSDOT, the City of Kirkland, and project partners celebrated the start of construction of the Stride bus rapid transit (BRT) project and the NE 85th interchange in Kirkland.

The I-405 Stride BRT project includes the S1 Line between Burien and Bellevue scheduled to open in 2028 and the S2 Line between Bellevue and Lynnwood scheduled to open in 2029. A third Stride BRT line between Shoreline and Bothell (S3) will also open in 2028.

Ad Loading...

The Benefits of Stride BRT

BRT is part of Sound Transit’s 2016 voter-approved system expansion program, ST3. Stride will provide fast, reliable high-capacity transit service with connections to light rail in Bellevue, Tukwila, Shoreline, and Lynnwood.

When Stride begins operating, trips between Bellevue and Burien will take approximately 40 minutes; trips between Lynnwood and Bellevue will take approximately 35 minutes; and trips between Shoreline and Bothell will take approximately 37 minutes. These travel times are an average of 20 minutes faster than current ST Express bus service in these areas.

“Stride will be a great new resource for transit riders, bringing more and more communities throughout the region into our high-capacity transit network,” said King County Executive and Sound Transit Board Chair Dow Constantine. “Launching this project is another step toward delivering on the vision voters approved with ST3 and will be an exciting step forward for the Puget Sound region.”

Improving Transit Access

As part of the I-405 BRT project, Sound Transit and WSDOT are building a redesigned NE 85th interchange, which will include an inline Stride station. The redesigned interchange will allow for improved transit access and direct access to express toll lanes, improving speed and reliability for I-405 travelers.

The interchange and BRT stop will open in 2026, before the S1 Line, to serve existing transit routes. Other elements of the project include pedestrian and bike access, a passenger pick-up and drop-off area, new stops for local transit service, and express toll lane direct access ramps.

Ad Loading...

“A sustainable and equitable transportation network gives all our communities a wide range of mobility opportunities to meet our wide-ranging connection needs,” said Sound Transit CEO Julie Timm. “Stride BRT is an integral piece of our expanding and interconnected regional transit system being built to bring more people to more places more effectively and more efficiently.”

More Bus

Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
King County Metro electric buses made by GILLIG.
Busby StaffJanuary 30, 2026

Seattle's King County Metro Introduces New Battery-Electric Buses

Rolling out in electric yellow and seafoam blue, the first battery-electric buses purchased from GILLIG will begin serving riders in south King County on February 2.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Ad Loading...
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Busby StaffJanuary 28, 2026

New Orleans RTA Reaches Agreement with ATU

The agreement provides competitive wages and reflects strong labor-management collaboration, positive working relationships, and a shared commitment to building a world-class transit system for the community, said RTA CEO Lona Edwards Hankins.

Read More →
Two ABQ RIDE busses at an intersection by Gold street in front of a parking structure.
Busby StaffJanuary 27, 2026

ABQ RIDE Launches Campaign to Bring Riders Back to the Bus

A new citywide campaign highlights free fares, improved service, and major upgrades to Albuquerque’s bus system.

Read More →
Ad Loading...
Busby StaffJanuary 27, 2026

California's OCTA Advances 2026 Initiatives Centered on Balance and Sustainability

The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.

Read More →
Railby Staff and News ReportsJanuary 26, 2026

People Movement: Virginia's DRPT Names New Director and More

In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Security and SafetyJanuary 22, 2026

Researchers Identify Top Risk Factors for Pedestrian-vehicle Crashes at Massachusetts Bus Stops

While their comprehensive analysis of bus stops focused on Massachusetts, the researchers are excited about the generalizability of the findings and application to other locations.

Read More →
Ad Loading...
ManagementJanuary 22, 2026

Florida's JTA Unveils Mobility Visioning Plan 2050 at State of the Authority Event

CEO Nat Ford’s address offered a look at highlights from 2025, with a focus on the future and the innovative ways the JTA is shaping mobility in Northeast Florida.

Read More →