Sound Transit, WSDOT Break Ground on Stride BRT Project
The I-405 Stride BRT project includes the S1 Line between Burien and Bellevue scheduled to open in 2028 and the S2 Line between Bellevue and Lynnwood scheduled to open in 2029.

Stride BRT will provide fast, reliable high-capacity transit service with connections to light rail in Bellevue, Tukwila, Shoreline, and Lynnwood.
Screenshot Via Sound Transit
Sound Transit, WSDOT, the City of Kirkland, and project partners celebrated the start of construction of the Stride bus rapid transit (BRT) project and the NE 85th interchange in Kirkland.
The I-405 Stride BRT project includes the S1 Line between Burien and Bellevue scheduled to open in 2028 and the S2 Line between Bellevue and Lynnwood scheduled to open in 2029. A third Stride BRT line between Shoreline and Bothell (S3) will also open in 2028.
The Benefits of Stride BRT
BRT is part of Sound Transit’s 2016 voter-approved system expansion program, ST3. Stride will provide fast, reliable high-capacity transit service with connections to light rail in Bellevue, Tukwila, Shoreline, and Lynnwood.
When Stride begins operating, trips between Bellevue and Burien will take approximately 40 minutes; trips between Lynnwood and Bellevue will take approximately 35 minutes; and trips between Shoreline and Bothell will take approximately 37 minutes. These travel times are an average of 20 minutes faster than current ST Express bus service in these areas.
“Stride will be a great new resource for transit riders, bringing more and more communities throughout the region into our high-capacity transit network,” said King County Executive and Sound Transit Board Chair Dow Constantine. “Launching this project is another step toward delivering on the vision voters approved with ST3 and will be an exciting step forward for the Puget Sound region.”
Improving Transit Access
As part of the I-405 BRT project, Sound Transit and WSDOT are building a redesigned NE 85th interchange, which will include an inline Stride station. The redesigned interchange will allow for improved transit access and direct access to express toll lanes, improving speed and reliability for I-405 travelers.
The interchange and BRT stop will open in 2026, before the S1 Line, to serve existing transit routes. Other elements of the project include pedestrian and bike access, a passenger pick-up and drop-off area, new stops for local transit service, and express toll lane direct access ramps.
“A sustainable and equitable transportation network gives all our communities a wide range of mobility opportunities to meet our wide-ranging connection needs,” said Sound Transit CEO Julie Timm. “Stride BRT is an integral piece of our expanding and interconnected regional transit system being built to bring more people to more places more effectively and more efficiently.”
More Bus

Brian Dickson on Building Stronger, More Resilient Transportation Organizations
Bus Business Consultants Founder Brian Dickson discusses the leadership principles, operational discipline, and strategic planning that separate transportation companies positioned for long-term success from those stuck in survival mode.
Read More →
LA Metro Breaks Ground on Vermont BRT Project
The 12.4-mile corridor is projected to serve 66,200 daily riders, reduce travel times by up to 24%, and create the nation's busiest bus rapid transit corridor.
Read More →
Roman Cornell on ABC Companies’ Evolution and the Future of Passenger Transportation
The company’s CEO discusses carrying forward a third-generation family legacy, ABC’s continued evolution in passenger transportation, support for increasingly complex fleets, and how technology and continued investment could help operators improve uptime.
Read More →
VIA Bus Ridership Grows 10.1% Through August 2026
San Antonio's VIA Metropolitan Transit reported the highest bus ridership growth among major Texas transit systems. Federal Transit Administration data ranked it second among the nation's 50 largest transit systems.
Read More →
LA Metro September Ridership Climbs 3.9%, Led by Rail Growth
The agency recorded more than 27.2 million boardings, with rail ridership increasing 12.4% year over year and the D Line posting the largest gains.
Read More →
Frontrunner Bus Group Introduces XF Low-Floor Bus with Enhanced Accessibility
The new mid-sized bus features a full flat-floor design, eight-inch curbside step-in height, and zero-entry rear ramp to improve passenger access and operational flexibility.
Read More →
Scenes from APTA TRANSform & EXPO 2026
Transit leaders, manufacturers, and industry professionals gathered in Chicago to explore new technologies, share ideas, and discuss the future of public transportation.
Read More →
More Than a Summer Job: Building the Next Generation of Transit Talent
The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.
Read More →
LA Metro Board Awards 220 Battery-Electric Bus Contract to ENC
The contract, which is the largest base award of battery-electric buses by a U.S. transit agency, will be built in Southern California, sustaining good jobs as LA prepares to welcome the world in 2028
Read More →
Public Transit Conference Returning to GFX in 2027, Call for Papers Now Open
The Call for Papers is now open, allowing transit agency professionals and industry experts to help shape the PTC educational program by submitting session ideas for consideration.
Read More →