RELATED: 'Transformative' IIJA Bill Could Transform Transit for Years to Come
Amtrak Begins B&P Tunnel Replacement Work
The project is funded by a grant from the FY 2019 Federal-State Partnership for the State of Good Repair Program.

The first phase of the Amtrak B&P project is targeted for completion early this summer, with additional project work related to the replacement of an existing turnout in Winans with a new high-speed turnout in a future phase.
Amtrak
Amtrak is ready to begin early construction activities as part of the B&P Tunnel Replacement Program. The first project is set to kick off March 10 in the Halethorpe and West Baltimore areas. The work includes replacing aging wooden ties with new concrete ties, installing new rail, and completing track drainage improvements.
The project is funded by a grant from the FY 2019 Federal-State Partnership for the State of Good Repair Program. The upgrades will enable high‐speed operations on all four tracks along this track segment.
“The collaboration between the state of Maryland, Amtrak, our federal partners and Baltimore is making the long-awaited replacement of the B&P Tunnel a reality,” said Maryland Transportation Secretary Paul J. Wiedefeld. “This initial work by Amtrak is laying the foundation for the new Frederick Douglass Tunnel, and will help us improve mobility, access and service for riders throughout the region.”
The overnight work associated with track and tie replacement will take place on Track A from Winans to Bridge interlockings and is not expected to impact rail service. Bridge interlocking is located north of West Baltimore Station and Winans interlocking is at the south end of Halethorpe Station. The first phase of the project is targeted for completion early this summer, with additional project work related to the replacement of an existing turnout in Winans with a new high-speed turnout in a future phase.
At nearly 150 years old, the B&P Tunnel is Amtrak’s oldest tunnel on the Northeast Corridor and a single point of failure for both MARC and Amtrak trains. The 1.4-mile tunnel, connecting Baltimore to Washington, D.C., suffers from a variety of age-related issues such as excessive water infiltration, a deteriorating structure, and delays that impact more than 10% of weekday trains.
The $6 billion program will eventually be advanced by Amtrak and its partners by utilizing federal funding provided by the IIJA. The program is comprised of several investment projects to construct new bridges, rail systems and track, an ADA-accessible West Baltimore MARC station, and the new Frederick Douglass Tunnel, which will include two new high-capacity tubes for electrified passenger trains.
More Rail

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →
The Business Voice Behind Public Transportation
As chair of APTA’s Business Members Board of Governors, Ray Melleady explains how more than 850 business members are partnering with transit agencies to advance funding, innovation, and industry-wide collaboration.
Read More →
FRA Announces $5.3B in Rail Investments, Including $2B for Amtrak
Funding will support grade-crossing improvements, infrastructure upgrades, and new Amtrak equipment in 23 states.
Read More →
Finding the ‘Happy Medium’: Optimizing Maintenance Without Sacrificing Reliability
The key to maintenance optimization isn’t doing less work—it’s doing the right work at the right time on the right assets.
Read More →