METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom’s Citadis LRVs Debut on Toronto’s Finch West LRT

The Citadis LRVs will operate on an entirely new line, with a dedicated right-of-way separated from traffic.

December 5, 2025
Alstom’s Citadis LRVs Debut on Toronto’s Finch West LRT

Made by Alstom at its Brampton facility and tested at its Kingston site, each Citadis vehicle offers a spacious design, accommodating up to 300 passengers comfortably while being fully accessible for strollers and people with mobility needs.

Photo: Alstom SA 2025. Metrolinx

2 min to read


Alstom, in partnership with Metrolinx, welcomed the commissioning of 18 Citadis light-rail vehicles (LRVs) on Toronto’s Finch West Light Rapid Transit (LRT) line. 

The Finch West LRT marks a significant step forward in delivering sustainable, efficient transit to Toronto’s growing communities, all powered by Alstom’s commitment to innovation and Canadian expertise.

Ad Loading...

Connecting via Transit

The Citadis LRVs will operate on an entirely new line, with a dedicated right-of-way separated from traffic. 

The line is 6.4 miles long; it has 16 stops and two stations: the Finch West station in the east and the Humber College Station in the west. It is connected to the Toronto Transit Commission (TTC) Line 1 Finch West subway station via a pedestrian portal. 

The project will cut down travel time and increase transit reliability. The Finch West LRT project is part of the Ontario government’s multibillion-dollar investment in public transit systems that will help connect Ontarians via transit for generations.

Toronto’s New LRVs

Made by Alstom at its Brampton facility and tested at its Kingston site, each Citadis vehicle offers a spacious design, accommodating up to 300 passengers comfortably while being fully accessible for strollers and people with mobility needs.

The 100% low-floor Citadis vehicle is designed for the Canadian market and capable of operating in winter conditions down to -38°C. They are fitted with winterized systems to ensure operational performance and optimize passenger comfort and experience through reinforced insulation, powerful HVAC, and snow and ice management, said Alstom officials.

Ad Loading...

To date, Alstom has delivered more than 8,000 Citadis LRVs to 140 cities in more than 30 countries worldwide. 

Manufacturing the Vehicles

Vehicle assembly for the Finch LRV took place in Brampton from 2020 to 2024. At peak production, this contract supported over 180 jobs in Ontario and expanded the size of a critical workforce for the growing rail sector. 

Over the last few months, Alstom has worked with its partners at Metrolinx and the TTC to test, maintain, and prepare for the launch of these modern, efficient vehicles. Alstom is also responsible for the maintenance of the cars, the track, and the catenary system for the next 30 years.

More Rail

An Amtrak Acela train at New York Penn Station
Railby StaffMarch 24, 2026

Transportation Secretary Duffy, Amtrak Announce Progress on New York Penn Station Project

As part of the contract, the AECOM-LiRo NYPennT Joint Venture will work with Amtrak and the selected Master Developer to completely transform Penn Station, improving safety and operational efficiency, making the system more family-friendly, accommodating increased train and passenger capacity, and delivering a world-class experience to its growing passenger base, according to Amtrak officials.

Read More →
A screenshot of ZeroEyes AI gun detection technology.
Railby Staff and News ReportsMarch 24, 2026

ZeroEyes Launches ZeroLink to Expand AI Gun Detection Beyond Traditional Networks

New edge-based solution enables real-time threat detection and situational awareness in remote, mobile, and infrastructure-limited environments.

Read More →
A Chicago rail and rail car in the city.
Railby Staff and News ReportsMarch 23, 2026

Chicago Transit Authority Sues USDOT Over Paused Funding for Red Line Extension, Modernization Projects

The Chicago agency seeks restoration of nearly $2 billion in federal funding, warning halted projects could impact transit access and economic growth.

Read More →
Ad Loading...
GO Transit railcars
Railby StaffMarch 20, 2026

Alstom Awarded 5-Year Extension for GO Transit, UP Express Services

Company officials said that this latest contract extension with Metrolinx consolidates the company’s position as the leading private provider of Operations and maintenance services in North America.

Read More →
A New York MTA subway car with an open gangway
Railby StaffMarch 20, 2026

New York MTA Seeks Bids for 2,390 Subway Cars in Record-Breaking Order

The new cars, model R262, will be funded by the MTA’s 2025-29 Capital Plan, which received a historic $68 billion in funding from Governor Hochul and the State Legislature in the FY26 Enacted State Budget.

Read More →
Graphic from Amtrak promoting the B&P Tunnel Replacement and Frederick Douglass Tunnel project, featuring the Amtrak logo, project title and an illustration of a high-speed train near the West Baltimore MARC Station.
Railby News/Media ReleaseMarch 17, 2026

Amtrak Announces Community Grants for Projects Near Baltimore’s New Frederick Douglass Tunnel

Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.

Read More →
Ad Loading...
Amtrak train with logo
Railby StaffMarch 16, 2026

Amtrak Marks Restoration of Two South Carolina Stations

The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.

Read More →
A view looking down the rail across the new Portal North Bridge.
Railby Staff and News ReportsMarch 13, 2026

NJ Transit, Amtrak Prepare to Open First Track on New Portal North Bridge

The new bridge will begin carrying passenger trains on March 16, replacing a 116-year-old swing bridge that has long caused delays.

Read More →
Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
Ad Loading...
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →